Contact:Ms. Jane Lau(Sales Manager)
Email:sales02@shinedew.com
Tel:0086-755-2818 0795
Fax:0086-755-2818 0796
Mobile:0086-13632715746
Skype:shinedewmodels
Step I: Quotation
Whenever you have interesting in making a scale train model project, please send us the blueprint/dimension chart and some photos that taken from different directions of the real train. Of course, your specific requirements will be helpful. Then we will work out the preliminary quotation for you, including the detail cost and reference schedule for each step.
Step II: 3D Design
If our quotation is acceptable by you and you want to launch the project, then we can start the 3D design/drawing after you send us more pictures and information with details. It will take about 20 -30 working days to complete the 3D design for wagons, and about 50-60 working days to complete the 3D design for locomotives.
Step III: Tooling/Moulding
After you approve the 3D drawing, the tooling can be started. Normally it will take about 25-35 working days for us to complete the tooling for wagons, while 45-60 working days to complete the tooling for locomotives.
Step IV: PE Sample/1st Shot Sample
The PE sample of wagon will be delivered within about 15 working days after the molds made ready.
The PE sample of locomotive(with PCB and motor assembled) will be delivered within about 30 working days after the molds ready.
Step V: Decoration Sample
The decoration samples would be prepared ready in about 30 working days after PE sample and decoration drawings confirmed.
Step VI: Production
Usually we can prepare ready the goods according to your order in about 2-3 months after you confirm the decoration samples and order.
Step VII: Delivery
We will either help you or assist you to arrange the delivery by sea, by air or by express according to your requirement after you check the goods in our factory or confirm the production samples from us.
Copyright2015 Shine Dew Industrial Ltd. All rights reserved